AACS LIMITED
  • Home
  • About Us
    • News
    • Case Studies >
      • University of Sunderland Cadaveric Facility
      • University of Sunderland Murray Library
      • Gleeson Homes Tyne and Wear Regional Office
      • University of Sunderland 3D Print Centre
      • CA Roofing - Modular Building Install
    • Vacancies
    • Testimonials
    • Join Us
  • Services
    • Air Conditioning
    • Refrigeration
    • Ventilation
    • Heating
  • Blog
  • COVID-19 Support
    • Book Your Free Air Quality Survey
  • Contact Us
    • Customer Portal
  • 0191 523 6441

University of Sunderland 

​3D Print Centre

University of Sunderland 3D Print Centre

On behalf of Gemini Mechanical

Picture
Out with the Old
Picture
In with the New

​​AACS Limited were awarded the project to install a new VRF Air Conditioning system to replace ageing equipment at the University of Sunderland’s Industry Centre as part of an upgrade to their existing 3D printing lab, the upgrade meant that there were greater heat loads in the main 3D printing room.

​Therefore a requirement for more cooling was needed, the project was delivered by Gemini Mechanical Services.
Picture
The old Ceiling Cassette was removed
Picture
And replaced with a sleeker model, alongside LED light replacements that were completed as part of the programme by the Mechanical Contractor

​AACS Limited installed Air Conditioning supplied by Mitsubishi Electric.
 
The Install itself consisted of a mixture of 7 indoor Air Conditioning Units (Wall Mounted, Ceiling Cassette and Ceiling Suspended) fed from a new slimline VRF Condensing unit located externally to the building resulting in more space in the external paddock area.
Picture
Picture
The old Cassette was replaced
Picture
In it's place, a more energy efficient model

​AACS Limited also installed a Mitsubishi Electric AE-200E Centralised Controller as part of the installation.
Picture
Mitsubishi Electric AE-200E Central Controller

​​RAMS were submitted and approved prior to installation, the install consisted of one team of engineers on site for 5 weeks completing the works and the O&M Manual for operation was submitted upon request at the end of the installation.
[email protected]

More Than Just Air Conditioning

Air Conditioning
Refrigeration
Ventilation
Heating
0191 523 6441

AACS Limited

About Us
Services
​Blog
Testimonials
[email protected]

Get in Touch

Contact
Email
Call
COVID-19 Support​
Picture
Picture
Picture
© COPYRIGHT 2015. ALL RIGHTS RESERVED.
  • Home
  • About Us
    • News
    • Case Studies >
      • University of Sunderland Cadaveric Facility
      • University of Sunderland Murray Library
      • Gleeson Homes Tyne and Wear Regional Office
      • University of Sunderland 3D Print Centre
      • CA Roofing - Modular Building Install
    • Vacancies
    • Testimonials
    • Join Us
  • Services
    • Air Conditioning
    • Refrigeration
    • Ventilation
    • Heating
  • Blog
  • COVID-19 Support
    • Book Your Free Air Quality Survey
  • Contact Us
    • Customer Portal
  • 0191 523 6441